2S53 1722 London Waterloo to Weybridge
Departing on 20th April 2024

operated by
South Western Railway
8 coaches
450028
450031
GBTT
WTT
RTTRealtime
Route
Mi.Ch
Location
Pl
Arr
Dep
Arr
Dep
Arr
Dep
Dly
Path
Line
0.00
London Waterloo [WAT]
Pathed as Electric multiple unit at 100mph
19
1722
1722
1722½
WR
0.40
pass
1723½
pass
1724
WR
DWS
1.29
4
1726
1726
1725½
1726½
1726½
1727¼
1.78
pass
1728
pass
1728½
DWS
DW
2.50
3
1729
1729
1729
1729½
1729¾
1730½
+1
DW
DWF
3.17
pass
1730½
pass
1731½
+1
3.74
5
1732
1733
1731½
1733½
1733
1733¾
4.60
2
1736
1736
1735½
1736
1735½
1736½
5.72
3
1738
1740
1738
1740
1738½
1739¾
7.07
3
1743
1745
1742½
1745
1742
1744¾
DWF
DH
7.54
2
1747
1747
1746½
1747
1746¼
1747
8.47
2
1749
1750
1749
1750
1749
1749¾
9.34
pass
1751½
pass
1751¼
9.53
2
1752
1752
1752
1752½
1752
1752¾
10.01
pass
1753½
pass
1753¼
10.52
2
1755
1755
1754½
1755½
1754¾
1755¾
11.34
2
1757
1757
1757
1757½
1757¼
1758
12.10
2
1759
1759
1759
1759½
1759¾
1800¾
+1
13.40
2
1802
1803
1802
1803½
1803
1804
14.19
pass
1805
pass
1805
14.48
pass
1806
pass
1805¾
DH
DT
16.01
2
1809
1809
1808½
1809½
1808½
1809¼
18.53
2
1813
1813
1813
1813½
1812¾
1813½
20.15
2
1817
1817
1816½
1817½
1816
1817
22.15
2
1822
1822
1821½
1822
1821½
1822½
24.28
4
1826
1826
1826
1826½
1826¼
1827
DT
DC
26.68
1
1831
1832
1831
1832
1831½
1832¼
28.22
1
1835
1835
1834½
1835
1834½
1835½
29.25
pass
1836½
pass
1837¼
30.05
Approaching
Weybridge [WYB]
1
1839
1839
1839¾
DC